Configure The Rules
Follow these steps to set up your Sprint Auto Scheduler configuration:
Step 1: Select Your Scrum Board
Begin by selecting a Scrum board from the dropdown menu.
Note that only boards configured as Scrum type will be displayed in the list. Boards of other types (like Kanban) will not appear as options.
Step 2: Configure Auto Start and Auto Stop Settings
You'll see toggle switches for two main automation features:
Auto Start: Automatically starts the next sprint when conditions are met
Auto Stop: Automatically stops the current sprint when the sprint end is reached.
Toggle these settings on or off based on your team's workflow preferences.
Step 3: Configure Auto Stop Behavior (If Enabled)
When Auto Stop is enabled, you need to specify where incomplete work items should be moved:
Work Item Destination Options:
Next Sprint: Moves open items to the next available sprint
Backlog: Returns open items to the product backlog
Next Sprint Configuration:
If you selected "Next Sprint" as the destination, you'll need to choose:
Create New Sprint: Enable this if you want the system to automatically create a new sprint when one doesn't exist
Fallback to Backlog: If disabled, items will be moved to the backlog when no next sprint is available
Step 4: Set Sprint Creation Advance Settings
Configure how many sprints you want the system to create in advance:
Range: None to 5 sprints
Recommendation: Consider your team's planning horizon and release cycle when selecting this number
Step 5: Save Your Configuration
Click the "Save" button to apply your settings. You'll receive a toast notification confirming that your configuration has been saved successfully.
Permission Requirements
Important: The configuration will only be saved if you have the necessary permissions. You must have "Manage Sprint" permission for all projects associated with the selected board.
If you lack the required permissions, the system will display an error message and prevent the configuration from being saved.
Troubleshooting
If you encounter issues:
Verify you have Manage Sprint permissions for all relevant projects
Ensure your selected board is configured as a Scrum board
Check that your sprint advance settings align with your team's planning capacity
Your Sprint Auto Scheduler is now configured and ready to automate your sprint management workflow.
Check Important Points to understand the exceptions.